Project
Completed projects
EBARA VIETNAM PUMP FACTORY PHASE 2 PROJECT
JCM is Main Contractor.
Civil Work: Main Factory (7.671m2): Pile foundation & steel structure, Iron wall cover & roof, Urethan paint for floor finishing. Ware house & cateen building (1.244 m2): Pile foundation, steel structure, brick wall cover & iron roof, ceramic tile for follr. Office (1.400 m2 ): 2 Floor buiding, OA floor with carpet for 2nd floor finishing, Other by Ceramic tile
M&E Work: Fire & fighting system, A/C system, Air compressor system, water supply for production system, 40 ton Crane system…