OHTSUKA SANGYO MATERIAL VIETNAM FACTORY PROJECT – PHASE 1
JCM is Main Contractor.
Civil Work: 01 storey Factory, Steel structure, EPS panel + Iron wall cover & roofing work. Brick wall to elevation 2.30m to top is metal wall. Floor by Epoxy paint 1mm thickness, Floor Hardener. Office & Canteen area, ceramic tile for floor, gypsum ceiling board
M&E Work: HF lighting system, Fire & fighting system - Sprinkler system, A/C system, Cooling Water System, Air compressor system, Generator system, Waste water treatment, water suply system, …