Project
On-going projects
BUILDING NO.5 OF JIS SECONDARY AND HIGH SCHOOL PROJECT
Supporting of Design and Construction Management & Consultancy.
Civil Work: Building No. 5 was built for teaching and studying purpose of JIS Secondary and highschool students. The building was constructed in a V shape with 6 floors according to Japanese school standards; including Classroom, Common room , Functional Room (Laboratory of Physical/ Chemiscal/ Biological/ geographical Education), Computer Room, Library Room and Two Stage Theater.
M&E Work: Sound and lighting system for the 2 stage theater (5,6 floor); Main electrical cabinet; Standard lighting system for classrooms and playground for students; Air-conditional system and fire fighting system for classroom.