ARION ELECTRIC FACTORY PHASE 1

JCM is Main Contractor. Civil Work: 1-floor factory, 2 Floor in office area, Factory by Brick wall to elevation 1.1m to top is metal wall. & iron roofing work. Floor by floor Epoxy paint, Include is office, toilet. M&E Work: Fire & fighting system, A/C system, Air compressor system, Clean room, humility check room, water supply for production,